Kitchen & Bath Remodeling
The Two Rooms That Decide How a Home Feels
Kitchens and bathrooms are where remodeling budget buys the most daily improvement — and where cheap work shows fastest. Water, heat, grease and constant use expose shortcuts within a year or two. We build these rooms to be lived in for decades.
Kitchen remodeling
- Layout & storage — working triangles, island sizing, pantry and cabinet planning that fits your cooking habits
- Cabinetry — stock, semi-custom and custom options with soft-close hardware and proper alignment
- Countertops — granite, quartz and solid surface with correctly templated sink and cooktop cut-outs
- Backsplash & tile — subway, stacked, mosaic and full-height installations
- Lighting & electrical — task lighting, under-cabinet lighting, dedicated circuits and appliance wiring
- Plumbing & ventilation — sinks, disposals, dishwashers and range hoods vented to the exterior
Bathroom remodeling
- Walk-in and roll-in showers — curbless options, benches, niches and frameless glass
- Tub replacements — freestanding, alcove and garden tubs with proper framing and waterproofing
- Vanities & storage — single, double and vessel-sink configurations
- Waterproofing done properly — cement board, waterproof membranes and flood-tested pans before tile
- Ventilation — correctly sized exhaust fans ducted outside to stop mold and peeling paint
- Accessibility — grab bars, comfort-height toilets and step-free entries for aging in place
Waterproofing is the part you never see. Ask any contractor what is behind their tile. We will show you: substrate, membrane, sealed penetrations and a pan that holds water before a single tile goes down.
Typical timelines
A straightforward bathroom remodel usually runs two to four weeks on site. A full kitchen remodel typically runs four to eight weeks depending on cabinet and countertop lead times. We give you a written schedule and tell you immediately if something changes.
What our customers say
Michael and his team are the best at what they do — family owned and a veteran. I’ll use them for every future need.
Very fast response time and super friendly service. I’ll be recommending them to my friends and family.
An excellent company. If you need a new roof, these are the folks to call.
Kitchen & Bathroom Remodeling, answered
A typical hall or guest bathroom runs two to three weeks on site. Larger primary bathrooms with layout changes usually run three to five weeks.
Yes. Many clients buy their own tile, fixtures or appliances, and we install them. We will tell you what lead times and specifications to watch for so nothing arrives wrong or late.
We coordinate licensed plumbing and electrical trades as part of your project and manage their scheduling, inspections and rough-in sequencing.
Ready to make your dreams become a reality?
Free consultations and clear, detailed estimates — for homeowners, churches and businesses across Central Texas and the Greater Houston area.